Experience: Education
Project Name: Emmac Cooling
Description: Provide detailed design for environmental conditions for lab equipment, to maintain the room condition to no more than a 0.5oC swing over a 1 hour period.
Location: Kings Buildings, Edinburgh
Total Construction Value: £300k
Client: Edinburgh University
Project Scope: We are carrying out full detailed design of the air conditioning plant and pipework to ensure laboratory conditions are reliably maintained to within the equipment’s optimal operating parameters in a historical building.